Michels – Sunoco Mariner II, Shirleysburg, PA 32 miles of due-lines 16” & 20’ pipe

Michels – Sunoco Mariner II, Shirleysburg, PA  32 miles of due-lines 16” & 20’ pipe

There were a lot of challenges on this job and they all were very dangerous. Most of this job was winch work, meaning you are hanging off a mountain by 3 or 4 dozers to get up and down ROW. Also, we were only given 75’ of ROW, which means we had to dig and install the 20” line and cover up and then go back and do the same for the 16” pipe, forcing us to have to tackle these huge mountains twice. This job was also going through a state forest presenting other challenges. You have to not only do your job, but also watch out for civilians trying to enjoy this state land. It can also bring upon protestors and/or people who are willing to try and harm you and/or your equipment during the non-working hours (evenings or weekends).